Tyler data center builder for healthcare and institutional owners: hardened halls, UPS rooms, generator plants and tested commissioning.
Hospitals cannot wait for a server to come back, and in Tyler we build the hardened rooms, backup power plants and cooling systems that keep clinical systems running through a storm or a utility loss. Our work for healthcare-driven markets centers on redundancy that is proven by test: generators that start under load, batteries that carry the gap, and cooling that survives the loss of a pump. We build enterprise data centers and private halls for East Texas owners who want that resilience inside the region they serve.
The city's employer list explains the demand. In the 2022 to 2023 financial report, the largest employers were one health system with 5,000 employees and a second with 3,500, followed by the school district, a poultry processor, a national retailer and a state university campus. The metro area has 233,479 residents by published count, and the city's hospitals are operated by several health systems. Hospitals depend on electronic records, imaging archives, pharmacy automation and building controls, all of which sit on servers somewhere.
Many of those servers now sit in small closets that were never designed for the job. We help owners decide whether to upgrade the closet, build a dedicated room or move to a purpose-built hall, and we price each option against the cost of an outage.
Interstate 20 runs along Tyler's north edge, US Highway 69 passes through the center of town, State Highway 64 crosses east to west, and Loop 323 encircles the city, with Loop 49 serving as a limited-access outer loop. Delivery of heavy equipment is straightforward on that grid, because a truck can bypass the center on one of the loops and reach most parts of the city from the interstate.
Tyler Pounds Regional Airport offers service to Dallas-Fort Worth International Airport, which helps owners whose engineers fly in from other cities. East Texas also sits at some distance from the Dallas market in the minds of site selectors, though in practice what matters to a builder is that the city has its own power, labor and permitting, and that it can support a facility from design through commissioning without relying on the Dallas market for help. For owners who want both a local hall and a distant disaster-recovery site, the Dallas side of the interstate is a short flight or a long drive away, and we can coordinate the two builds under one schedule.
A health system is the obvious owner, but it is not the only one. The school district, the state university campus and county services all depend on the same infrastructure. The work is similar to what we describe for enterprise and financial institutions, with additions for clinical environments: infection-control practices during construction, coordination with facilities staff in occupied buildings and strict control of noise and dust near patient areas.
Some institutions prefer to build, and others prefer to lease space in a shared facility. We can design a building that serves both, with a secured owner suite and separate leasable halls, then phase the construction to match demand. A hospital that joins a shared hall often benefits from lower capital cost and faster deployment, while the host gains a stable first tenant that makes the next lease easier.
We schedule, supervise and inspect the slab, the equipment pads, the duct banks and the structure. That matters for healthcare projects, because a hospital's schedule leaves little room for rework and little tolerance for surprise. Managing the underground, the concrete and the structure closely gives us control of the early path and lets us give an owner a firm date for the building to be watertight.
The same teams handle the battery and UPS rooms, which need ventilation, floor loading and containment designed for the chemistry selected. We coordinate with the electrical subcontractor and the equipment manufacturer so that batteries, switchgear and breakers arrive in the order they are installed.
Texas led the nation in 2024 with 878 hail events and 169 tornadoes, and insured losses in the state exceeded $47.2 billion. A hall's roof carries the cooling equipment, so a hailstorm can damage the very machines that keep the building running. We specify roof membranes and equipment screens with that exposure in mind, and we discuss impact-resistant options and rooftop guards with the owner's insurer before the design is final.
Tyler's permit path is the city's, and the building code baseline is the International Building Code unless the city has adopted amendments. We confirm the adopted version, the energy code that applies and any accessibility review by the state at the start. For related guidance on a facility's wider requirements, see our page on security perimeter and access control.
When the project touches an existing campus, the schedule must account for infection control, restricted work hours and utility shutdowns that clinical staff must approve days in advance. We plan these as discrete events, with written method statements, tested rollback procedures and a named person on each side.
The same rigor applies to commissioning. We run the full set of tests with the owner's engineer, including a utility-loss test with the building under real load, and we do not call the hall complete until the results are signed off. Owners who also operate facilities in Longview or Texarkana can use the same test scripts across sites, which saves time on later projects.
Tell us what the room must support, the outage you cannot accept and the building or parcel in mind. We will return a design direction, an outline schedule and the questions we need answered.
We separate the work with barriers, negative pressure where required, scheduled noisy tasks and daily cleaning. Utility shutdowns are planned with facilities staff in advance, and each one has a written rollback. Infection-control rules come from the hospital, and we follow them.
It depends on size, control and capital. Building offers maximum control but takes more money and management. Leasing is faster and cheaper to start. We can design a shared building that includes a private owner suite, so the decision does not have to be final on day one.
Interstate 20 on the north edge, US 69 and SH 64 through town, and Loops 323 and 49 around it. We choose a route that avoids the center for oversize loads and we verify bridge and overhead clearances before shipping.
With a durable membrane, equipment screens or guards and sometimes a secondary roof surface. Insurance carriers have views on what they will cover, so we involve the owner's broker early and document the design choices.
Yes. A multi-tenant hall can host both with separate cages, power feeds and cooling zones. The shared building needs clear rules on access and maintenance, which we help the owner draft.