Richardson data center builder for colocation suites, enterprise fit-out and edge rooms, covering power distribution, cooling, cabling and acceptance testing.
Tenants who lease space in a Richardson colocation building want a finished suite fast, with power, cooling and cabling that match the contract they signed. We build those suites. Our fit-out work covers the electrical distribution from the landlord's feed to the racks, the cooling distribution that serves the room, the containment and cage layout, and the structured cabling and meet-me connections that tie the suite to its carriers. We also build enterprise and edge rooms where the owner needs smaller, tightly controlled space.
Few places in Texas have such a dense concentration of connected businesses, and telecom and network carriers are among the natural neighbors for any tenant. The city calls itself the Telecom Corridor, and more than 5,000 businesses operate within its 28 square miles. Interstate 635, U.S. 75 and the President George Bush Turnpike along the north edge put that cluster within quick reach of the rest of the Metroplex, and the Red and Orange rail lines along U.S. 75 plus the Silver Line, which began service on October 25, 2025, carry staff to stations at CityLine and the university.
Large payrolls reinforce the enterprise side of the market. The city's economic development partnership lists an insurer with 8,000 employees, a telecommunications company with 5,000, a health insurer with 3,100 and a university with 2,674, and organizations of that size keep sensitive systems close to their staff. For a tenant, the question is rarely whether the building has power. It is how quickly the suite can be energized and accepted, which is the schedule we manage.
Developers have been adding mission-critical buildings to the corridor for years. A $1 billion project was proposed in 2018 on 33 acres at Shiloh Road and the President George W. Bush Turnpike, described as 900,000 square feet with its own electric substation, and a 130,000-square-foot building near CityLine followed with a utility-owned substation on the property and a city tax abatement of 50 percent on business personal property for ten years.
Those details tell a tenant what to ask a landlord. Is the building served by a dedicated substation? How much capacity is committed to the suite? What does the abatement cover when a tenant adds equipment? We read the lease exhibits and utility letters with the tenant, and turn them into scope, cost and schedule for a fit-out under colocation data center construction.
Lease commencement dates drive the schedule, and rent usually starts whether or not the suite is ready. We build a reverse schedule from the date the first rack must be powered, then work back through acceptance testing, cabling, equipment set, rough-in and permit. Switchgear, power distribution units and cooling equipment are ordered with that date in mind, and we report weekly against the plan.
Landlords control many of the dependencies, including freight elevator time, loading dock use, shutdown windows for shared systems and access to meet-me rooms. We line these up in writing before mobilization. Where a tenant needs rapid deployment, modular and prefabricated data halls can be built off site and connected to landlord power and cooling in a few weeks.
A typical scope covers the room envelope, sealed slab or raised floor, ceiling and containment, electrical distribution from the landlord point of connection, branch circuits and busway, cooling distribution and controls, fire detection and suppression, security hardware, cable pathways, grounding and labeling. We also assemble the commissioning plan, so the tenant knows what will be tested and who witnesses it.
Connectivity gets special attention. Telecom carriers, internet exchanges and cloud on-ramps often meet in a shared room, and the cabling paths between that room and the suite must be diverse and documented. Our carrier hotel and meet-me room experience informs the pathways and labeling standards we specify.
Every fit-out involves at least three parties with different priorities: the landlord protecting its building, the tenant protecting its uptime and the carriers protecting their circuits. We run a single coordination meeting with all three, keep one issue log and publish decisions the same day, so no one builds on an outdated drawing.
We start from power and cooling, then work back to the room. That means checking the landlord's available capacity, the redundancy the tenant needs and the cooling supply before drawing a rack. If a gap appears, such as a requirement for more chilled water than the building can provide, we raise it before the lease is final.
Other tenants and the landlord's own systems are running while we work, so work plans must keep them safe. We issue method statements for energized work, lock-out procedures, hot-work permits and ladder or lift protocols, and each trade partner attends a site orientation. Our cleanliness and safety program adds dust control and particle counts for the live floor.
Compliance extends to the permit process. The city reviews electrical, mechanical, fire and life safety submittals, and we obtain landlord approval of every penetration and tie-in. If you also have a satellite site in Plano or Garland, we can run the same safety standards in all of them.
Send the lease exhibits, the load and the date your first rack must be live. We will return a scope, a reverse schedule and a list of landlord and utility items to resolve first.
The duration depends on suite size, power density and equipment lead times. Cabling and room construction can move quickly, while switchgear and cooling equipment often govern the date. We set the schedule from the equipment orders and report the critical path every week.
Yes. Landlords usually require approved methods and sometimes approved vendors for shared systems. We submit our plans for review, follow the building rules and coordinate shutdowns with the landlord's staff.
An enterprise room supports a company's central systems and usually needs higher redundancy. An edge room places compute near users or networks, and is smaller, often modular and sometimes unstaffed. We design each for its own risks.
Carriers terminate in a meet-me or demarcation room, and cross-connects run to the suite through diverse pathways. We build and label those pathways, verify the routes and test the connections before turnover.
We write test scripts with the tenant, run them with the landlord present when shared systems are involved, and record results in a turnover package. Load banks, failure simulations and alarm verification are standard.
Yes, if we plan for it. We size feeders, leave space in distribution, reserve pathways and install pads or stubs, so adding racks or cooling later does not require shutting down the suite.